Our services cover the Project Coordination, Facilitation & Management of O & G Facilities as per the project specs and applicable standards and also provide project support for such Facilities.
A successful project is always measured within the parameter of three important indices of triangle namely estimated budget, time and quality standards. These three factors: budget, time and quality, constitute the back bone of every single project.
Though time and quality might be of equal importance in the life cycle of a project, nothing can move forward without the necessary amount of money and that requires a well-planned and properly estimated budget.
For project management team, being able to comprehend the importance of cost estimation and budgeting from the very initial phases of a project is critical.
Everyone in the project management world is clear of the importance of budgeting in project management.
All project procedures are tightly interwoven around project budgets. The amount of available or required cash, in most cases, dictates the duration and type of the used resources, operations and activities within the realm of a project. In the case of project budgets, a miscalculation, poor judgment or a lack of proper oversight may result in the collapse of the whole endeavor.
When it comes to poor estimation of project budgets the potential scenarios that might occur are many and all of them have negative consequences. First and foremost are the effects on meeting the client’s expectations. Not being able to deliver the agreed upon deliverables and quality standards of the project’s products might have a significant effect.
it’s impossible to underestimate the importance of cost estimation when it comes to successfully completing a project.
Before even approaching a project, it’s important to get a handle on cost estimation to help keep you on task and in touch with project constraints and limitations. it’s impossible to underestimate the importance of cost estimation when it comes to successfully completing a project, before even approaching a project.It is important to get a handle on cost estimation to help keep you on task and in touch with project constraints and limitations. SBS have this ability to prepare well defined estimates, meeting Client’s expectation ensuring quality project execution per scheduled duration.
Boundless Business Services (BBS) Estimating Engineers with their vast experience have built up estimates for various client’s that includes but not limited to Saudi Aramco, SABIC, Royal commission facilities and private sectors.
Boundless Business Services (BBS)Estimating Engineers have developed accurate estimate (5-10%) of the project cost for Oil & Gas, Petro-chemical, Power & Energy Sector, Infra-Structure and Utility facilities.
Estimates indicates the total cost at completion of all elements of the defined project or scope of work and is an essential project deliverable required for key decision support and control purposes during project development, planning and execution.
The following are various types of Estimates:
CAPEX Cost Estimates are delineated by internationally accepted classifications as follows:
Class Definition Purpose (Typical)
1. Study Feasibility Study
2. Budgetary Conceptual Design
3. Preliminary Early FEED
4. Detailed FEED Completion
5. Definitive Detailed Design
Boundless Business Services (BBS) Team is very much capable and can prepare the above mentioned estimates to the desired accuracy.
Boundless Business Services (BBS) provides procurement services to clients as per their requirement meeting the standards and defined quality procedures
The services include;
This activity includes other marketing/ promotion, such as: – Marketing discount cards – Marketing of Local products globally – Promotion of foreign products in local market – Distribution of promotion of trial samples – Provision of time-share exchange services – Sale of holidays in tourist resorts worldwide
*Midyan Gas Facilities
*Replace Tank Gauging System at Riyadh Refinery
* Upgrade Trap Compression Facilities
* Shaybah Crude Stabilization – Abqaiq
* Shoaiba Refined Products Distribution Facilities
* Replace Electrical Equipment at Southern Area GOSP’s
* Hail Bulk Plant
* Upgrade Power System – Tanajib Plant
* Replace Maintenance Building Uthmaniyah and Hawiyah
* Jubail Bulk Plant Interface Facilities
* Gas Compression Facilities at Pump Station # 3
* Upgrade Fire Water System at Ras Tanura
* Upgrade Tanks Dewatering System at Ju’aymah and Ras Tanura Terminals
* Upgrade Building for Risk Mitigation, Abqaiq Plants
* Replace Fire Alarm Systems @ CS Facilities Saudi Aramco
* Replace Control System at UGP & SHGP
* Clean Transportation Fuels, New FO & HFB Loading Facilities At Riyadh Refinery
* Mangrove Eco Park Rahimah
* KAUST Research Park Utilities Expansion
* Rabigh Phase II Petrochemical Project (Tank Package, Aeration Package,
Incinerator Package)
* Upgrade Fire Protection System Rastanura Refinery
* GAS Phase-9 Plot Plan and Utilities Study (SABIC)
* Water Handling Debottlenecking South Ghawar Area
* Debottlenecking Abu Safah GOSP Water Separation – Qatif Plant
* Decommissioning of existing Bahrain Pipeline Project
* Engines and Marine Pumps Manufacturing Facility
* Casting, Forging and Machining Facility
* Upgrade Condensate Stabilization and Sour Water Stripper at UGP
* Upgrade Condensate Stabilization and Sour Water Stripper at SHGP